How Long Does a Kitchen Renovation Take? Realistic Toronto Timelines

An honest phase-by-phase breakdown of the custom kitchen process — from initial design to final walkthrough.

How Long Does a Kitchen Renovation Take? Realistic Toronto Timelines

A custom kitchen renovation in Toronto typically takes ten to sixteen weeks from the initial design meeting to a fully functional kitchen.

Phase 1: Design (1-2 Weeks)

The design phase begins with your initial consultation and ends with your approval of the final design and quote.

Phase 2: Manufacturing (6-8 Weeks)

After design approval, your kitchen enters production in our Toronto factory. This methodical process cannot be rushed.

Phase 3: Installation (1-2 Weeks)

Installation is the most visible phase. It includes demolition, cabinet mounting, and countertop fabrication.

Related ReadingFrom the journal.All Entries →
Custom vs. Stock Kitchen Cabinets: Which Is Right for Your Toronto Home?
Essay

Custom vs. Stock Kitchen Cabinets: Which Is Right for Your Toronto Home?

How Much Do Custom Kitchens Cost in Toronto? (2026 Guide)
Guide

How Much Do Custom Kitchens Cost in Toronto? (2026 Guide)

Semi-Custom vs. Fully Custom Kitchens: What's the Difference?
Notes

Semi-Custom vs. Fully Custom Kitchens: What's the Difference?

Ready to Start Your Project?

Your home deserves cabinetry built with intention.

Whether you are renovating a kitchen, updating a bathroom, or adding built-in cabinetry to your living space, Apico Kitchens is here to help.

Book Your Free ConsultationCall (416) 410-3695
TorontoGreater Toronto Area