A custom kitchen renovation in Toronto typically takes ten to sixteen weeks from the initial design meeting to a fully functional kitchen.
Phase 1: Design (1-2 Weeks)
The design phase begins with your initial consultation and ends with your approval of the final design and quote.
Phase 2: Manufacturing (6-8 Weeks)
After design approval, your kitchen enters production in our Toronto factory. This methodical process cannot be rushed.
Phase 3: Installation (1-2 Weeks)
Installation is the most visible phase. It includes demolition, cabinet mounting, and countertop fabrication.